Waterborne self-leveling floor paint
Applicable place: There is no construction waterproof layer of the first floor or basement floor to the construction of odor requirements, especially for the food and drug industry. Function features: environmental protection, water as solvent, no pungent odor; The film is permeable; Seamless dustproof; Mildew - proof, anti - bacterial performance is excellent. Main performance: note: all tests (except the drying time) was conducted in curing 7 days (25 ℃) construction procedures and main materials: pilot project construction method the main materials, auxiliary materials base processing grinding base, repair defects, clean and dry - bottom coating roller coating epoxy primer water-borne epoxy primer - with epoxy mortar layer of coating material mixing quartz
key word:
Public building
Category:
Product Description
Place of application:
No construction waterproof layer of the first floor or basement floor to the construction of odor requirements, especially for the food and drug industry.
Functional Features:
Environmental protection, water as a solvent, no pungent odor; The film is permeable; Seamless dustproof; Mildew - proof, anti - bacterial performance is excellent.
Main performance:
Note: All tests (except drying time) were performed after 7 days of curing (25 ° C)
Construction procedure and main materials:
Test project construction method Main materials and accessories
Base surface treatment grinding base surface, repair defects, clean and dry
Bottom coat Rolled epoxy primer Waterborne epoxy primer -
The mortar layer is made of epoxy middle coating material mixed with quartz sand to the required thickness of water-based epoxy middle coating quartz powder
The putty layer is prepared with epoxy middle coating material and quartz powder. The putty layer is scraped with water-borne epoxy middle coating quartz powder and Shuangfei powder
The top paint layer is sprayed or rolled with a water-based epoxy floor paint
Coating thickness: generally 1mm~3mm, more than 3mm to press sand.
Section drawing show:
Precautions for construction:
1】 Construction site, please pay attention to good ventilation
2】 No fireworks during construction;
3】 in the construction of stains to clean, after the construction of the site will be removed garbage
4】 Ground dust must be thoroughly removed to ensure the subsequent effect of the primer;
5】 The ground shall be cement powder light, strength 3000PSI (or 210kg/cm2,C-25) above, the surface shall be hard, smooth, no delamination, sand phenomenon, and do water treatment
6】 When the ground is wet, it must be dry, the moisture content is below 8%, or select special primer
7] epoxy resin coating if there is more than the effective follow-up agent time, the material surface roughened and processed clean, coated with a layer of primer (according to the interval length), and then the lower coating construction
8] primer due to solvent, need to be completely volatilized before construction, so as to avoid bubbling phenomenon
9) The damp place is first dried with a gas blowtorch (lighter) or sun lamp, and then coated with primer or special primer;
10】 When the material is stored in the open air, it should be neatly stacked on the pallet and covered with PVC tape, so as not to water the material;
11】 The stirred material should be coated within the available time to avoid the surface close to hardening and unable to flow
Related products
Epoxy colored sand self-leveling
Non - slip microbead floor paint
Wrinkly surface non-slip surface coating
Epoxy super wear resistance flat coating
Waterborne polyurethane transparent finish
Acrylic acid court paving system
Silicon PU court paving system
PVC sports floor paving system
Floating assembled sports floor
Welcome to leave a message
Tel:400-0730-009
Email:COO@gaozhikj.com
Address: No. 5, Fuhai Market East Street, Chang'an Town, Dongguan, Guangdong
Copyright © 2022 Gaozhi floor paint